In connection with the commissioning of power plants and signed preliminary contracts for grid connection we provided consultations with regard to some problems that arose between the producers of energy and the grid operator concerning the conclusion of a final contract for grid connection and joining to the parallel of sites. The distribution company denied to sign the final contracts for grid connection due to technical impossibility for inclusion in the parallel of sites as well as due to outstanding relations with the transmission system operator. With our teams work the contracts for grid connection were signed and the objects entered into exploitation.